The data displays the estimated levelized capital costs for each energy system after its implementation in the U.S. in 2022. The levelized capital costs for natural gas-fired advanced CC with carbon control and sequestration (CCS) plants are estimated to stand at 82.4 USD per megawatt hour for plants entering service in 2022.
Solar Thermal | 242 |
Wind - offshore | 157.4 |
Natural gas-fired conventional combustion turbine |
109.4 |
Biomass | 102.4 |
Advanced nuclear | 99.1 |
Natural gas-fired advanced combustion turbine |
94.7 |
Solar PV | 85 |
Natural gas-fired advanced CC with CCS |
82.4 |
Hydro | 66.2 |
Wind - onshore | 63.7 |
Natural gas-fired conventional combined cycle |
57.3 |
Natural gas-fired advanced combined cycle |
56.5 |
Geothermal | 46.5 |