Forecast of estimated LCOE generation by energy source 2022

Estimated levelized capital costs of energy generation in the U.S. in 2022, by energy system (in U.S. dollars per megawatt hour)

The data displays the estimated levelized capital costs for each energy system after its implementation in the U.S. in 2022. The levelized capital costs for natural gas-fired advanced CC with carbon control and sequestration (CCS) plants are estimated to stand at 82.4 USD per megawatt hour for plants entering service in 2022.

Solar Thermal 242
Wind - offshore 157.4
Natural gas-fired conventional
combustion turbine
109.4
Biomass 102.4
Advanced nuclear 99.1
Natural gas-fired advanced
combustion turbine
94.7
Solar PV 85
Natural gas-fired advanced
CC with CCS
82.4
Hydro 66.2
Wind - onshore 63.7
Natural gas-fired conventional
combined cycle
57.3
Natural gas-fired advanced
combined cycle
56.5
Geothermal 46.5